一区中文字字幕AV片|日韩一级视频在线观看|动漫精品3D在线网址黄|免费看欧美一级特黄a大片|一区二区精品在线视频看看|本道久久综合无码中文字幕|久久九九久精品国产免费直播|亚洲毛片不卡av在线播放一区

Jiaozhou No.1 Energy Station
    National Technology Social Benefit Project
    National demonstration project of new energy heating
    Providing full heating for about 10 thousand residences, this KC Blue system has an energy station covering an area of only 1600 square meters, and a total project cost of nearly 100 million RMB. The system was completed in 2017, and will become operational after high voltage power lines are connected, prior to the 2018 heating season.  Using the company's pioneering sewage water heat pump technologies, the system extracts sensible heat from a main municipal sewage line, and applies it for building heating.  This available, readily extracted heat will satisfy the heating demand of about 1 million square meters of residential buildings.  
    As a result, the annual coal consumption will be reduced by about 9000 tons; and annual CO2 emissions will be reduced by 26,000 tons, SO2 emissions by 270 tons, NOX emissions by 500 tons, and dust/particle emissions by 1,700 tons. Once operational, this, the first KC Blue energy station in Jiaozhou clearly will continuously demonstrate that KC Blue’s advanced sewage water source heat pump system has the ability to replace coal-fired boilers for very large volume building heating.